We close in three weeks and the radon test failed. Is there time to fix it?

Direct answer

Usually, comfortably. A written scope can be done within days, the install itself is typically one day, and a 48-hour verification test follows once the fan has run. The sequence fits inside three weeks when the first call comes now.

More detail

Work the calendar backward from closing. The verification test needs the system running a day or two first, plus its own 48 hours, plus lab turnaround if a passive device is used, so the install wants to land at least a week before the closing table. Before the install comes the scoping visit and the signed proposal, which is where delay actually happens: every day spent arguing about who pays is a day the schedule loses. Flag the hard constraints on the first call, the closing date, the foundation type, whether there is a sump or crawl, and whether the buyer's lender wants the retest in the file, and the design visit gets booked around them. Winter closings add one soft risk, a cold snap that delays exterior work, which is another argument for starting the week the test fails rather than the week before closing. The real estate radon service is built around exactly this squeeze; see also who pays.

Authoritative sources

Ready to get started?

About 2 in 5 Minnesota homes tested hold radon at levels worth fixing, by MDH's own count. Mon-Sat 8am-7pm.

Call (651) 317-5960Text us

Prefer to text? Open your texting app