How long does a radon mitigation install take?

Direct answer

Most single-suction-point installs in a basement or slab home finish in one day, usually four to eight hours. Add time for a crawl space membrane, a second suction point, or tricky discharge routing. The verification test follows a few days later.

More detail

The visible work is quick: core a hole in the slab, dig the suction pit, run pipe to the attic or up the exterior, hang the fan, seal the sump and visible cracks, mount the gauge, label the system and fix the MDH tag. The schedule risk lives around the edges. Winter installs may wait on a day warm enough for exterior sealant to cure, attic routes through a finished Edina story-and-a-half take longer than a straight shot through a Lakeville garage, and a house that needs an airflow diagnostic before design adds a visit. After the fan starts, give the house a day or two to reach its new equilibrium, then run the post-install test to confirm the number. If a closing date is driving the calendar, say so in the first call; the whole sequence compresses to fit most inspection windows. See the real estate timeline.

Authoritative sources

Ready to get started?

About 2 in 5 Minnesota homes tested hold radon at levels worth fixing, by MDH's own count. Mon-Sat 8am-7pm.

Call (651) 317-5960Text us

Prefer to text? Open your texting app